60V High-Voltage LDO Selection: Load Dump Withstand, 48V System Margin and the Five Costs of Upgrading

Voltage Rating Upgrade: Both Rated 60V,
Why Does One Survive 10 Pulses While Another Latches Up on the 3rd?
Two LDOs both say "60V input". One passes every pulse of an OEM's ISO 16750-2 ten-pulse test; the other locks its output at 1.2V on the 3rd pulse. The difference is not in that "60", but in the four definitions behind the number, two process choices, and the margin the whole protection chain leaves it.
Two Cases: One Passes Every Pulse, One Latches Up on the 3rd
The two cases in this section are typical scenarios constructed to illustrate the difference in criteria. Parameters are taken from public standards and common failure modes and do not correspond to any specific customer.
Case A: The Prototype Passes One Pulse, the Production Part Locks Up on the 3rd
The power board of a 48V zone controller must draw power from the bus for the main controller, the CAN transceivers and several sensor bias rails. The bus is nominally 48V and is designed for 36~58V. Two LDOs rated "60V input" were selected: one for the main controller's analog domain, one for the communication domain.
At the prototype stage, a single-pulse load dump test was run. This is also the default practice in many labs, because Pulse 5a in the old ISO 7637-2 required only one pulse. The prototype passed: the waveform showed an output overshoot of about 2V and a 30μs recovery time, which the engineers judged acceptable.
Production parts were sent to the OEM for an ISO 16750-2 retest: 10 pulses, 1 minute apart. After the 1st pulse, the output was normal. After the 2nd, normal. After the 3rd, the communication-domain LDO locked its output at 1.2V. It did not drop to 0; it sat stably at 1.2V while the input was still 48V, and the chip was hot but not burned. A power cycle recovered it; test again, and it failed on the 3rd pulse again.
This is a classic latch-up, not an overvoltage breakdown. The difference is reversibility: avalanche or thermal breakdown leaves irreversible damage and the chip does not recover on its own, whereas latch-up is a parasitic structure that, once triggered, conducts by itself and is cleared by removing power. That is why it shows up as "locked" rather than "burned out". Latch-up needs two conditions at once. First, the transient voltage exceeds the absolute maximum rating and injects a large enough trigger current: this device's abs max is only 65V, while the TVS's actual clamping point reached 71V because of parameter spread and PCB ground bounce. Second, the chip contains a parasitic PNPN path that can be triggered: it uses a junction-isolation process, and that path exists exactly between the high-voltage transistor and the low-voltage logic. The first condition pulls the trigger; the second is the gun.
Case B: Also Rated 60V, Passes All 10 Pulses
Another case, again a 48V bus and again an LDO rated 60V. The differences are in two places: this device's absolute maximum rating is 75V, and its process uses deep trench isolation.
Under the same test, all 10 pulses passed. On the waveform, the output overshoot was 3.2V on the 1st pulse and 3.4V on the 10th, up only 0.2V, showing that the device accumulated no damage. Looking inside, deep trench isolation completely separates the high- and low-voltage regions with oxide sidewalls, so that parasitic PNPN path simply does not exist. When the same transient current arrives, there is no structure to trigger.
The cost is price: this device is 40% more expensive than the one in Case A. Purchasing kept asking one question: "They're both 60V, so why not use the cheaper one?"
Why This Problem Always Surfaces at Mass Production
The two cases have one thing in common: both "passed" prototype testing.
Case A passed a single pulse. The difference between one pulse and ten is not just the count: load dump is a wide 400ms pulse, and its energy density is close to a DC operating point.
The heat source has to be attributed correctly here first, or the later calculations will land in the wrong place. What heats it up is not the 12μA of static leakage: at 48V that works out to only 0.6mW, not even a rounding error. It is the 2.59W on the pass transistor during these 400ms: the TVS clamps the input to 55V, the output is 3.3V, and the communication-domain rail is taken at a typical 50mA load, so a 51.7V dropout times 50mA gives 2.59W. This is the "keep regulating" in the first cell of Table 6: VDS takes the full dropout, the downstream sees a stable output, and the price is the worst SOA case. 2.59W on a 220°C/W thermal resistance means a steady-state rise of 570°C. Of course 400ms does not reach steady state, but this time scale already exceeds the tens-of-milliseconds thermal time constant of a small package, so it climbs a considerable part of the way.
The first pulse hits, and the device's local internal temperature has not yet dissipated when the second pulse stacks on top; the third reaches the critical point. ISO 16750-2 specifies a 1-minute interval, which looks like enough time to cool, but for a SOT-23 device with a package thermal resistance of 220°C/W, 1 minute only brings the junction temperature down by about half.
Case B did not rely on the test method but on two layers of protection: an absolute maximum rating of 75V is 4V above the 71V test peak, so the transient never crosses the line; and even if it did, the deep trench cuts off the parasitic path, leaving no structure to trigger. The first layer is margin, the second is structure; missing either one, it would not survive the 3rd pulse.
So both cases point to the same conclusion: in the face of load dump, "rated 60V" carries almost no information. It says nothing about the absolute maximum rating, nothing about the isolation process, and even less about how much SOA is left at a pulse width as close to DC as 400ms.
The next four sections connect this chain of cause and effect piece by piece: Section 02 explains which four numbers "60V" actually refers to, Section 03 calculates how much current and energy actually flow during the 400ms, Section 06 expands "keep regulating" in the first cell of Table 6 into an SOA criterion, and Section 07 puts the 2.59W into the thermal resistance to calculate the junction temperature. Only the four sections together fully explain the words "the 3rd pulse".
"60V" Is Four Numbers, Not One
Break the phrase "60V rating" apart and it corresponds to at least four different parameters. Look at only one of them when selecting a part, and the other three will come back to bite you on the test bench.
The "Wide Input Voltage: 3V to 60V" written under Features on the first page of the datasheet. This is the upper limit of the recommended operating range, meaning "within this voltage, all specifications hold". It is not the highest voltage the device can withstand; it is only a design operating point.
VIN in the Absolute Maximum Ratings table. Beyond this value, the manufacturer guarantees no behavior at all: neither that it will fail nor that it will not. This entry is usually 5~10V above the rating; a 60V rating paired with 65~70V is common practice. Whether a part survives load dump depends first on whether this entry is high enough.
This is an energy definition, not a voltage definition. 101V, 400ms, 10 times: what is tested is how many joules the device absorbs during that time, and whether the junction temperature crosses the safe line. Datasheets almost never state this number directly; you have to calculate it yourself from the SOA curve and thermal resistance.
The Safe Operating Area curve: horizontal axis VDS, vertical axis ID, with pulse width as the parameter. The 400ms of load dump already sits against the DC line on this chart. You cannot think of it as a "pulse"; it is closer to a DC operating point lasting 0.4 seconds.
Of the four definitions, only the first is printed in the most prominent place. The other three require turning to the back half of the datasheet, and the fourth is often just a chart with no text. That is why "they're both 60V" became a popular saying: it describes only the number that is easiest to read.
In a 48V System, 60V Leaves Only 1.2V of Margin
Go one level further. 48V is not a fixed voltage; it is a nominal value. The two common implementations:
- 14-series Li-ion: 3.0~4.2V per cell, 42.0~58.8V per pack
- 4×12V lead-acid: 1.75~2.4V per cell (including float charge), 42.0~57.6V per bank
Both implementations top out near 58V at full charge. In other words, a 60V-rated LDO used in a 48V Li-ion system has only 1.2V of margin at full charge. Any normal switching overshoot on the bus, such as a relay opening, motor back-EMF or a sudden load release, will eat up that 1.2V.
This explains why Case A died: its absolute maximum rating is 65V, seemingly 6.2V above 58.8V, but the load dump peak is 71V, so the number 65V never even entered the discussion. Only Case B's 75V truly covers the 71V peak.
An Easily Overlooked Corollary
If the target market is 48V systems, the "voltage rating" in the product definition should not be set at 60V, but at absolute maximum rating ≥ 75V, rated operating limit 60V. 60V is the operating point; 75V is the survival line.
This distinction is not wordplay. Set it at 60V, and designing the process for a 65V breakdown is enough; set it at 75V, and the breakdown voltage needs to be above 85V, with a longer drift region, larger area and higher on-resistance. The first of the five costs starts right here.
The table below lays out the four definitions, comparing a device "rated 60V, abs max 65V, junction isolation" with a device "rated 60V, abs max 75V, deep trench", under the same ISO 16750-2 test.
| Definition | Device X (abs max 65V · junction isolation) | Device Y (abs max 75V · deep trench) |
|---|---|---|
| Rated input limit | 60V | 60V |
| Absolute maximum rating | 65V | 75V |
| Margin at 48V full charge | 6.2V | 16.2V |
| State at the 71V test peak | Exceeds abs max → avalanche current injection, triggers latch-up | Within abs max |
| Parasitic PNPN path | Present, can be triggered by transients | Cut off by oxide sidewalls |
| 10-pulse result | Latch-up on the 3rd pulse | All pass, overshoot up only 0.2V |
| Relative cost | 1.0× | 1.4× |
This table is not a ranking of "which is better". Device X is fully adequate in 12V systems with centralized clamping, and it is 40% cheaper. Its problem is: when the system really needs 60V, the 60V it offers is not that 60V.
There is an even more direct calculation: Table 4 will show that even the lightest TVS class (38V clamping) has an actual peak of 68V, and 65V cannot even reach that. The part is already 3V short on the day it is selected, without waiting for load dump.
The next four sections work out "what price has to be paid", one cost at a time. Each lands on concrete numbers, and each lands on a concrete process or layout choice.
The Standard Changed: 87V Became 101V, 1 Pulse Became 10
Before discussing "whether to do 60V", the test conditions must be pinned down first, because a voltage rating means nothing without a test waveform.
Pulse 5a/5b Has Moved
Many engineers' handbooks still carry an old rule of thumb: "For load dump, look at Pulse 5a of ISO 7637-2: 65~87V for 12V systems." In 2026 that rule has expired.
In the revision, ISO made a judgment: load dump is a vehicle power supply environment problem, not a typical EMC transient coupling problem. So Pulse 5a/5b were moved out of the ISO 7637-2 framework and into ISO 16750-2. Load dump testing for automotive electronics today should preferably use ISO 16750-2 (currently the 2023 edition) rather than continue citing 5a/5b of 7637-2.
This is not as simple as changing a standard number. The new standard tightened two things at once:
| Item | ISO 7637-2 Pulse 5a | ISO 16750-2 |
|---|---|---|
| Test voltage range | 65 ~ 87V | 79 ~ 101V |
| Pulse count | 1 | Test A: 10 Test B: 5a |
| Pulse interval | — | 1 minute |
| Total test time | Single shot | Test A: about 10 minutes Test B: about 5 minutes |
| Pulse width | 40 ~ 400ms | 40 ~ 400ms |
| Test A (no centralized clamping) | Voltage determined by the TVS | Open circuit up to 101V; all energy borne by downstream stages |
| Test B (with centralized clamping) | — | Generator set to about 35V (12V systems only; at board level, recalculate per Table 4); stress drops significantly |
a. The main text of ISO 16750-2 specifies 10 pulses at 1-minute intervals for Test A (no centralized clamping); for Test B with centralized clamping, some OEM specifications require only 5. Follow the specification that applies to the project. Also note: all data in this table are for 12V systems. Load dump for 48V and 24V systems cannot be extrapolated from this table by voltage ratio; the fixed values in the corresponding OEM specification (such as LV 148, Ford ES-XW7TCI240) must be cited.
The voltage ceiling rose from 87V to 101V, up 16%. For Test A, the pulse count went from 1 to 10, a tenfold increase; for Test B it is 5. Put the two together, and the demand on the device does not increase linearly.
Why "10 Pulses" Is Deadlier Than "101V"
Take Test A as an example. Looking at voltage alone, going from 87V to 101V only thins the margin. What really changes the nature of the problem is the pulse count.
The load dump pulse width is 400ms. On the scale of a device's thermal time constants, this no longer counts as a "transient": the junction-to-case thermal time constant of a package like TO-252 is on the order of tens of milliseconds, and 400ms is enough for heat to reach the bottom of the package. So when the first pulse hits, the junction temperature genuinely rises, then slowly falls during the 1-minute interval.
The question is whether that 1 minute is enough. Take a SOT-23 device with a thermal resistance of 220°C/W: if the average power during the pulse is 2W, the junction temperature rises 440°C. Of course, in practice it would hit thermal shutdown or be damaged partway. Even at only 0.5W, the rise is 110°C. One minute of natural cooling brings a package this small down by only about half. The second pulse stacks on a part that has not fully cooled, and the third approaches the limit.
This is why Case A died exactly on the 3rd pulse: not because the 3rd pulse was especially large, but because the first two heated it to a critical state, and the third delivered the final blow.
Doing the Energy Math
Load dump energy cannot be judged by voltage alone. Annex D of ISO 7637-2 gives a commonly used estimate: when the source internal resistance Ri and the load impedance RL are both 2Ω, the effect of the harness and connectors can be ignored, and then Uo = 2Us. The energy of a single pulse is:
W = ½ · UCL · Ip · td
The ½ here comes from the waveform shape: voltage and current both decay exponentially over the 400ms, so their product decays as the square, and the integral works out to exactly half of "peak power × time". Leave out the ½ and the calculated energy is overestimated by a full factor of two.
Which set of numbers to plug in has to be stated clearly first. Table 13 of ISO 16750-2 gives a set of ranges: for 12V systems, US is 79~101V, Ri is 0.5~4Ω, and td is 40~400ms. Values within the ranges cannot be combined arbitrarily. The common industry principle is high voltage with high resistance, low voltage with low resistance, because US and Ri both come from the alternator's excitation characteristics and are physically related. The specific pairings are set by OEM specifications; Chrysler PF-9326 and Ford ES-XW7TCI240 each have their own table.
This principle brings out an easily overlooked fact: the harshest voltage and the harshest energy are not the same combination.
- Harshest voltage: 101V with 4Ω (a worst-corner example, not an ISO-specified value). With clamping at 35V, the current is only 16.5A and a single pulse carries 116J. Its significance lies in setting the lower bound of the downstream device's abs max, not in energy.
- Harshest energy: 79V with 0.5Ω (a worst-corner example, not an ISO-specified value). With the same 35V clamping, the current is 88A and a single pulse carries 616J, more than five times the former. Its significance lies in setting the TVS energy rating and the thermal design.
So the voltage rating of downstream devices is set by the former, the energy of protection devices by the latter: two separate calculations. The table below takes 101V / 2Ω / 400ms, and each of the three numbers has its own source: 101V is the voltage ceiling of Table 13; 400ms is the upper limit of the 40~400ms pulse width range. Taking the upper limit is not for convenience: SOA and heat accumulation both worsen monotonically with pulse width, and 400ms is the hardest class to withstand. 2Ω is the calibration condition under which ISO 7637-2 Annex D derives its energy formula (Ri = RL), so the energy calculated with it can be lined up directly with the ratings in TVS datasheets. This set of numbers is an intermediate basis convenient for comparing against datasheets; it is neither the harshest voltage nor the harshest energy. Real part selection must run through both sets above.
Align the symbols first, or everything after will be wrong. In the table, US is 101V. This is the upper limit of US for 12V systems in Table 13 of ISO 16750-2, and it refers to the generator open-circuit voltage (excluding the alternator operating voltage UA). Ri is 2Ω, so Ip = (US − VCL) / Ri.
There is a trap here: ISO 7637-2 Annex D uses another symbol, Us, which refers to the peak voltage across the load RL. Only when Ri = RL = 2Ω does Uo = 2Us, that is, Us = Uo/2 = 50.5V. So US (101V) of ISO 16750-2 is numerically equal to Uo (open-circuit voltage) of Annex D, not Us. The two standards use symbols that differ only in letter case to denote different quantities, which is the most common source of error in load dump energy calculations. Treat 101V as Us and multiply by 2 to get 202V, and the energy doubles out of thin air, the peak moves from 50.5V to 101V, and the conclusion of the whole table is reversed.
| Clamping voltage VCL | Pulse current Ip | Instantaneous power | Single-pulse energy | TVS actual absorption (×70%) | 10-pulse cumulative, generator side (do not compare with device ratings) |
|---|---|---|---|---|---|
| 35V | 33.0A | 1155W | 231J | 162J | 2310J |
| 38V | 31.5A | 1197W | 239J | 167J | 2390J |
| 45V | 28.0A | 1260W | 252J | 176J | 2520J |
| 50V | 25.5A | 1275W | 255J | 179J | 2550J |
| 58V | 21.5A | 1247W | 249J | 174J | 2490J |
This table uses the simplified formula, which gives the engineering upper bound of the TVS current. The simplified formula assumes that all loop current goes through the TVS. This is the most conservative side: in practice the TVS is in parallel with the downstream stage, some current always goes into the load, and the TVS actually absorbs about 70% of the theoretical value (column 5 gives ×70%). The deviation is in the safe direction: a part selected by the simplified formula is one size larger than actually needed.
The other basis is the energy calibration formula of Annex D: replace the DUT with a purely resistive load of Ri = RL = 2Ω and calculate the energy borne by the load. For the same 101V / 2Ω / 35V, the simplified formula in the table above gives 33.0A / 231J (theoretical value, assuming all loop current goes through the TVS; the corresponding actual absorption in column 5 is 162J); by the Annex D load basis it is (101−35)/(2+2) = 16.5A, 116J. The two differ by a factor of 2 because the former calculates the TVS and the latter the load, which were never the same thing. A real DUT's input impedance is far higher than 2Ω, so load shunting can be ignored, and part selection follows the simplified formula. The whole article uses the simplified formula, switching to the Annex D basis only when reconciling the energy figures with an OEM.
Note: recalculated with the harshest energy combination (79V / 0.5Ω), the 35V row goes from 231J to 616J (about 2.7×) and the 58V row from 249J to 487J (about 2.0×). The ratio varies with the clamping point, because the two combinations have different open-circuit voltages and different peak positions, so a fixed factor cannot be applied. One more reminder: ISO gives ranges, OEM specifications give fixed values, and the two do not coincide. Ford ES-XW7TCI240, Chrysler PF-9326 and JASO D1 each specify a fixed combination of open-circuit voltage and internal resistance; some are looser than the ISO ranges, some harsher. When a project is matched to a particular OEM, the table above must be recalculated with that OEM's fixed values; the ISO nominal values cannot be applied directly.
By the way, a common miscalculation: treating 79V as Us (load voltage) of Annex D and multiplying by 2 to get an open-circuit voltage of 158V gives 123A / 861J, 40% higher than 616J. The number looks "more conservative", but it actually uses the same voltage twice. The 79V given by ISO 16750-2 is already an open-circuit voltage and does not need to be multiplied by 2.
Before looking at the last column, look at its header: "cumulative, generator side". This column states how much energy the generator releases in total over the 10 pulses; it is not how much the TVS absorbs, and even less how much the device must withstand. Comparing it directly with device ratings is a very common second kind of mistake: dividing the 2310J accumulated over 10 pulses by the device's energy capability. For example, seeing an 8kW-class TVS marked 8kW, multiplying by 400ms to get 3200J, and with 2310 ÷ 3200 = 0.72 concluding "enough margin, with 30% to spare". The error is treating PPP as the power capability at 400ms. PPP (numbers like 8kW and 6.6kW) corresponds to a 10/1000μs waveform. The pulse widths differ by a factor of 400, so the allowable power must be looked up again on the PPP–tp derating curve: an 8kW-class part (the SM8S type designed specifically for load dump) has only about a few hundred joules per pulse left at 400ms, and a 1500W-class small package has only a few joules.
So what really has to be checked against the device is the 162~179J in the "TVS actual absorption" column, not 231~255J, and even less 2310J. Keep these three numbers apart, and part selection will not go wrong from the very first step.
This table hides a counterintuitive conclusion: pushing the clamping point down from 58V to 35V raises the pulse current by 54% (21.5A → 33.0A) but lowers the energy by only 7% (249J → 231J). The energy peaks at VCL = US/2 = 50.5V, and 35V is only 10.4% below the 255J peak (by the TVS actual absorption column, 179J vs. 162J, also 10.4%). Saving energy by lowering the clamping point has a very poor return on investment.
Even more noteworthy: the 50.5V peak falls exactly on the 50V class, the one the industry selects most often. Choosing a 50V-clamping TVS means deliberately standing at the energy maximum.
So what is the point of raising the clamping point? It is margin, not energy.
A TVS's Clamping Point Is Not the Number in the Datasheet
When selecting parts, engineers look up the TVS datasheet, find the VCL entry, say 38V, and then conclude "the downstream device is rated 40V, that's enough". This conclusion misses three layers of amplification.
- Parameter spread: VCL is a typical value, with ±10% spread between batches
- Temperature coefficient: a TVS's breakdown voltage has a positive temperature coefficient and rises by about 10% from 25°C to 125°C
- PCB ground bounce: di/dt produces a voltage drop across parasitic inductance. Load dump di/dt is large, and a few nH of ground inductance can stack up 5~10V
Stack the three layers together:
| TVS nominal VCL | +10% spread | +125°C drift | +8V ground bounce | Minimum abs max (80% derating) |
|---|---|---|---|---|
| 38V | 41.8V | 46.0V | 54.0V | ≥ 68V |
| 45V | 49.5V | 54.5V | 62.5V | ≥ 79V |
| 50V | 55.0V | 60.5V | 68.5V | ≥ 86V |
There is an easily confused point here. If you only require "peak + 1V, then rounded", you get 55V / 63V / 69V (strictly extrapolating with the same factors, without the 1V margin and rounding down, it is 54V / 62V / 68V), and 55V seems enough. But that is only the threshold for "no breakdown", not "production margin". The 20% derating required by Criterion 2 is there to cover the tail of TVS batch spread, the worst case of PCB ground bounce and parameter drift at high temperature, so the table gives 68V / 79V / 86V. The two bases must be unified; otherwise the same case will produce two contradictory selection conclusions.
That is the whole answer: the TVS is nominally 38V, the actual peak is 54V. With 80% derating that requires 68V; a 40V LDO never even gets to see that "38V".
To keep a 40V device, with 80% derating the actual peak cannot exceed 32V, which means the TVS nominal clamping must be pushed below 20V. But a 20V-class TVS has a Vrwm of only 12~16V, and the normal charging voltage and load steps of a 12V system will make it false-trigger and conduct continuously until it burns out. Engineering-wise, this road is a dead end.
48V Systems: 40V Devices Don't Even Qualify for Discussion
The above is about 12V systems. For 48V systems the math is more direct.
A 48V bus is 58.8V at full charge. A 40V LDO in this system cannot even withstand the normal operating voltage, never mind load dump. That is why, as soon as a 48V architecture comes in, the 40V class is out on the bus side immediately; it can only retreat to secondary power domains, on a 12V or 5V rail after a Buck.
So is 60V enough? At 58.8V full charge, only 1.2V is left. One normal load release on the bus can eat that 1.2V. So in a 48V system, 60V is only the lower limit for "able to operate", not the upper limit for "able to survive".
Squeezed from Both Ends
On the 12V side: the standard went from 87V to 101V and from 1 pulse to 10, pushing the TVS clamping margin required by 40V devices to the point of being almost unachievable.
On the 48V side: the bus is 58.8V at full charge, and a 40V device is already out of bounds in the normal operating region.
Squeezed from both ends, the applicable boundary of the 40V class is compressed into the single corner of "12V system + centralized clamping (Test B, about 35V)". And that corner is exactly the part OEMs give up first when migrating to 48V.
Cost One: The Process Must Be Re-Selected
Going from 40V to 60V, the most intuitive idea is "make the high-voltage transistor a bit bigger". It isn't that. This cost lands on process selection, and once it is set, the other four calculations all change with it.
Why Junction Isolation Is Enough for the 40V Class
For 40V BCD processes, the mainstream approach is junction isolation: reverse-biased PN junctions separate the individual devices. Its advantages are a mature process, few mask layers and low cost; its drawback is that the isolation region is itself a semiconductor, so parasitic bipolar structures exist between the high- and low-voltage regions.
At the 40V class, the parasitic structures do not yet pose a threat. The reason is that latch-up needs two conditions at once: the loop gain of the parasitic PNPN positive feedback exceeds 1, and enough transient current is injected. In 40V devices, the isolation junction spacing is small and the parasitic transistors' current gain is low, so the loop gain stays below 1; even with transient current, it will not sustain itself.
That is why many 40V automotive LDOs pass AEC-Q100 with junction isolation: they face 12V systems, where the TVS clamps load dump to 35~40V and the injected transient current is limited.
Why the 60V Class Mostly Chooses Deep Trench
Raise the voltage to 60V, and two things change at once.
First, the isolation junction spacing must increase. The higher the breakdown voltage, the wider the depletion region, and the distance from the isolation junction to the active region must grow accordingly, or surface field crowding will break down first. This spacing grows linearly with voltage; at 60V versus 40V, the isolation region takes up roughly 40~60% more area.
Second, the loop gain of the parasitic PNPN goes up. With a higher bias on the isolation junction, the parasitic transistors' base width and doping profile change, and the current gain rises. A loop gain that used to sit below 1 may be pushed above 1. At that point it no longer needs a continuous external current injection; once a transient pulse triggers it, it sustains conduction by itself.
This is not speculation. The effect of deep trench on PNPN trigger and holding characteristics has been studied systematically with measurements in the device reliability field. The measurements presented by Voldman and Watson at IRPS 2004 (see References), using pnpn structures with deep trench at the edge, quantified how trench depth, p+/n+ spacing, external well resistance and external substrate resistance jointly determine the turn-on, trigger and holding conditions, and drew "trench depth × substrate resistance" as a design-space chart that can be used directly to set the layout.
Two conclusions are most worth remembering. First, the results are only a weak function of well resistance but a strong function of substrate resistance: what determines the latch-up trigger point is not the well but the substrate path. Second, the high trigger voltage advantage of deep trench has a precondition: in a review in the same body of work, the author gives a quantitative boundary: the external substrate resistance must be kept within about 100Ω, and once it is relaxed, the trigger voltage drops. On that paper's 0.13μm SiGe BiCMOS test structures, as the external substrate resistance increased from 10Ω to 300Ω, the latch-up trigger voltage fell from 55V all the way to 15V. That 55V is not an operating voltage; it is where deep trench pushes the trigger point, far above the supply voltage, which is exactly why it works. Once the substrate resistance is relaxed, the point falls back to 15V, not much different from an ordinary structure. The author calls this boundary the "design box" for substrate contact spacing.
In other words, trench depth decides "whether it is cut", and substrate contact density decides "how firmly it is cut". Missing either one, a deep trench is just an expensive decoration. This is also the real reason deep trench went from an "optional optimization" to "standard for high voltage": it is not a process option but a set of layout constraints that must all be in place at once.
This is the physical mechanism of the latch-up in Case A's device. It was not "damaged by 71V"; it was triggered by the transient current from 71V, and then held itself on through its own positive feedback until power was removed.
The most mainstream path, and the one that most readily allows a verifiable commitment on the datasheet, is deep trench isolation: etching plus oxidation digs trenches a few to more than ten microns deep between devices, with the sidewalls and bottom filled with oxide, physically separating the high- and low-voltage regions completely. Oxide is an insulator; there is no PN junction, and therefore no parasitic bipolar structure to trigger.
So can junction isolation never be used at 60V? No. Increasing the isolation spacing, adding guard rings, and moving the high-voltage transistor away from the low-voltage logic in the layout can all push the loop gain back below 1. Some 60V devices really do this and really do pass the test. The problem is that this approach has thin margin, depends heavily on layout details, and is hard to commit to on a datasheet: the customer gets a parameter table, not the layout. The value of deep trench is turning "will not latch up" from a design trick into a structural fact.
How Much Area and Cost Go Up
High-voltage devices follow a common industry rule of thumb for specific on-resistance: Ron,sp ∝ BV2.4~2.6. Raising the rating from 40V to 60V is a ratio of 1.5; raised to the power 2.4~2.6, the specific on-resistance becomes roughly 2.7~2.9 times the original (2.8× at the midpoint).
This means that for the same on-resistance requirement, a 60V power transistor has about 2.8 times the area of a 40V one. Add the extra area taken by the deep trench, the larger isolation spacing and the thicker epitaxial layer needed to withstand higher voltage, and the whole die is roughly 1.6~2.0 times that of the 40V version.
Double the area and the number of dies per wafer halves, raising unit cost. Add the 2~3 extra mask layers of deep trench, and the wafer cost of a 60V device is roughly 1.8~2.5 times that of 40V. But the end price did not rise by that multiple: the part in Case B is only 40% more expensive. The gap comes from the cost structure: the wafer is about 20% of total cost, so a 1.8~2.5× wafer increase passes through to total cost as +16%~+30%, 23% at the midpoint, with the rest absorbed by relatively fixed items such as packaging, test and logistics.
But one item goes the other way: the 60V class has essentially no low-cost SOT-23 option. Table 7 will show that 48V straight down at 100mA on SOT-23 is 1068°C, which is physically impossible, so only packages with an exposed thermal pad such as DFN 5×6 can be used, and their assembly and test cost is 8~12 percentage points higher than SOT-23. So the net cost increase is not 23% but 23% plus these 8~12pt, landing at 31~35%. With a 40% price increase, after cost, less than 5 points is left.
That is the side effect: the 60V class's gross margin is no thicker than the 40V class's. Squeezed from both ends, the 40% price increase just covers cost, and the premium is smaller than imagined. This is also why the 60V class does not automatically sell at a premium just for "higher voltage"; price still has to be set by the specific model's current capability and package.
Knock-On Effects of the Process Choice
Once deep trench is chosen, the other calculations all change with it: the trench sidewall capacitance affects transient response; the area taken by the trench pushes up the leakage component of IQ; the thicker epitaxial layer worsens thermal resistance; and once the process is frozen, AEC-Q100 qualification must be done on that version, so changing the process midway means starting over.
That is why "moving to 60V" is not a part-selection decision but a redefinition of the product platform.
Cost Two: IQ Goes Up
Quiescent current is the specification most often used to compare LDOs, and also the one most easily lost at high voltage.
What Makes Up IQ
An LDO's quiescent current at no load comes roughly from four parts:
- Error amplifier bias current: typically tens of nA to a few μA; the main controllable item
- Bandgap reference current: generally not pushed very low, for the sake of noise and accuracy
- Feedback divider current: a fixed output can use on-chip matched resistors to make it very small; an adjustable output depends on the external resistors
- Protection and detection circuits: overvoltage, undervoltage, overtemperature and enable logic; this part is the most troublesome in high-voltage devices
The first two items differ little between 40V and 60V, because they are low-voltage circuits. What really worsens with the voltage rating is the fourth.
Leakage in High-Voltage Devices Is Exponential
The overvoltage detection circuit must connect directly to VIN, so it has to use high-voltage transistors. High-voltage transistors have a longer drift region and larger junction area, and PN junction reverse leakage is proportional to junction area and exponential in temperature:
Ileak ∝ Aj · exp(−qφB / kT)
Raising the rating from 40V to 60V, the junction area of the high-voltage transistor grows more than 2 times as calculated in the previous section, and leakage grows more than 2 times with it. Worse, this leakage is amplified dozens of times at 125°C, while automotive Grade 0 requires an upper operating temperature of 150°C.
So the IQ a 60V device measures at 25°C and at 125°C may differ by an order of magnitude. Datasheets usually state the typical value at 25°C, and that number has no reference value in a vehicle environment.
Industry Status: 12μA Is the Limit, 20μA Is Mainstream
Look through a few public high-voltage LDO datasheets, and the lowest achievable IQ is on the order of 12μA, while most products fall around 20μA. Both numbers are orders of magnitude, not exact parameters of any one device; for specific models, check the 25°C and 125°C data in their own datasheets. Taken together, they show that low IQ at the high-voltage class is not "achievable with a little more effort" but the capability ceiling of a few designs.
Where does the gap come from? Mainly three places:
- How the reference is supplied: taking power directly from VIN, or pre-regulating internally first. The latter adds a circuit but improves the reference's supply rejection, at the cost of quiescent current
- How overvoltage detection is implemented: continuous monitoring with a high-voltage resistor divider, or intermittent detection by pulsed sampling. Intermittent sampling pulls the average current down, but responds more slowly
- Start-up circuit: high-voltage start-up usually needs a depletion transistor or high-voltage resistor; this current is often overlooked but is a sizable share in practice
In a 48V System, the Absolute Power of IQ Is Amplified 14.5 Times
This is an easily overlooked trait of high-voltage LDOs: IQ is a current, but standby power is voltage times current.
The same 15μA of quiescent current:
- In a 3.3V system, static power is 3.3V × 15μA = 49.5μW
- In a 48V system, static power is 48V × 15μA = 720μW
A factor of 14.5. For scenarios that run standby on a battery yet must keep certain rails powered while the whole system sleeps, such as a robot's safety monitoring domain or a vehicle's anti-theft and remote wake-up domain, this gap is real battery life.
So the value of low IQ in a high-voltage LDO is not "nice-looking specs" but that on a 48V bus, every 1μA is equivalent to 14.5μA in a 3.3V system. This is also why this specification deserves more investment at the high-voltage class than at the low-voltage class.
| IQ | 3.3V bus | 12V bus | 48V bus | Multiple vs. 3.3V |
|---|---|---|---|---|
| 2.5μA | 8.3μW | 30μW | 120μW | 14.5× |
| 12μA | 39.6μW | 144μW | 576μW | 14.5× |
| 20μA | 66μW | 240μW | 960μW | 14.5× |
How to read this table: in a 48V system, cutting IQ from 20μA to 12μA saves not 8μA but 384μW of continuous power. For a domain controller with 8 supply rails, that is 3mW.
How This Lands in the Product Definition
If you move to 60V, the IQ target cannot simply carry over the 2.5μA of the 40V class. There is an unavoidable physical constraint here: the lower limit of IQ is set by the leakage of the high-voltage transistors, leakage follows junction area, and junction area follows the voltage rating. Raise the rating one class, and the IQ floor rises one class.
| abs max class | Achievable IQ floor at 25°C | Junction area vs. the 40V class |
|---|---|---|
| 65V | 10~12μA | About 1.5× |
| 75V | 14~18μA | About 1.8× |
| 100V | 20~25μA | About 2.4× |
So the product definition of the 60V class cannot be written as "take the 40V class's 2.5μA and add a bit". A version that can get into automotive projects is: 25°C ≤16μA, 125°C ≤48μA (exactly 3 times), and having the nerve to print the 48μA high-temperature value right on the front page, not hidden in the fine print of the characteristic curves. The first number decides whether it gets into the selection table; the second decides whether it gets into automotive projects; daring to print it is the third threshold.
A datasheet that states IQ only at 25°C, with no high-temperature curve, is as good as stating nothing in automotive applications.
Cost Three: The SOA Must Be Redrawn
The voltage rating is sufficient, the process has been changed, the IQ has been accepted, and there is still one more hurdle: at that voltage, does the device dare to conduct at the same time?
How to Read an SOA Curve
The Safe Operating Area is the chart most easily skipped in a datasheet. The horizontal axis is the drain-source voltage VDS, the vertical axis is the drain current ID, and several diagonal lines are drawn on the chart, labeled 1ms, 10ms, 100ms and DC. The area enclosed by the curves is the set of "points where the device can operate safely".
Three things to note when reading this chart:
- The diagonal line at the upper right is the power limit: P = VDS × ID contour, with a fixed slope
- The vertical line on the right is the breakdown limit: VDS exceeding BVDSS means entering avalanche
- The horizontal line at the upper left is the current limit: constrained by the package leads or internal current limiting
The area in the middle changes shape with pulse width. The shorter the pulse, the higher the allowed power and the wider the area; the longer the pulse, the narrower the area, until it converges to the DC line.
On the SOA, 400ms Is No Longer a "Pulse"
This is the point this article most needs to stress. The load dump pulse width is 400ms, while most datasheet SOA charts are drawn only to 1ms or 10ms, and at most to 100ms.
Where does 400ms fall on this chart? Right against the DC line.
The reason is the thermal time constant. The power transistor die itself has a thermal time constant on the order of milliseconds, and the package (especially TO-252, DFN and others with an exposed thermal pad) on the order of tens to hundreds of milliseconds. 400ms is enough for heat to travel from the die to the bottom of the package and on into the PCB copper. In other words, what the device feels during a 400ms pulse is no longer "instantaneous power" but a thermal load close to steady state.
So judging a 400ms load dump with the 1ms SOA line overestimates the allowable power by several times. This is one of the technical reasons behind many cases of "the prototype passed, production failed".
Where Is the LDO's Operating Point During Load Dump?
An LDO is different from a TVS or a MOSFET. A TVS is a shunt device that conducts and diverts current during load dump; an LDO is a series device whose input voltage rises during load dump while its output still has to keep supplying power.
This creates a very harsh operating point: the pass transistor's VDS equals input minus output, and ID equals the load current.
Assume the TVS clamps the input to 55V, the output is 3.3V and the load is 50mA. (55V is not chosen at random: from the 58V class in Table 3, after subtracting the drop across the harness and PCB traces, the LDO input sees about 55V. This conversion also shows something else: the higher the clamping point, the larger the dropout the LDO has to bear, and the harder it is to get that point through the SOA. Raising the clamping point does not mean safer.)
- VDS = 55 − 3.3 = 51.7V
- ID = 50mA
- Instantaneous power = 51.7 × 0.05 = 2.59W
This point has to fall within the 400ms curve of the SOA. For a 60V device, VDS = 51.7V is already close to BVDSS, and the SOA narrows sharply near the breakdown voltage, because at that point the depletion region has already extended to the end of the drift region, the electric field crowds, and the threshold for secondary breakdown drops sharply.
Secondary Breakdown: The Physical Reason the SOA Narrows
The steep drop of the SOA curve in the high-voltage region is not a simple power limit but secondary breakdown.
The mechanism goes like this: when a power transistor operates at high voltage and high current, the temperature inside the die is not uniform. Where it is hotter, carrier mobility and threshold voltage drop, so current flows more toward that spot, which gets hotter locally, which concentrates the current further. This is positive feedback. When the local temperature crosses a critical point, the current suddenly contracts into a tiny channel (current crowding, also called the Spirito effect), the power density at that point soars, and it can burn through within a few microseconds.
This effect is especially dangerous with a pulse width as long as 400ms, because local hot spots have time to form and spread. With short pulses, heat has no time to build a temperature gradient inside the die and the current distribution stays uniform; with long pulses, the gradient builds up and the positive feedback starts to act.
So whether a 60V device can carry 50mA for 400ms near 55V cannot be judged by "2.59W is below the rating"; you have to check whether the SOA curve allows 50mA at the 51.7V point on the 400ms line.
What Should the LDO Do During Overvoltage?
Since this operating point is so harsh, the real engineering question is: during the 400ms of load dump, what exactly should this LDO do? There are four paths, each with its own price.
| Strategy | Pass transistor state | What the downstream sees | Cost |
|---|---|---|---|
| Keep regulating | VDS takes the full dropout | Stable output | Worst SOA case; needs a large package or derating |
| Enter pass-through | Fully on, minimum dropout | Follows the input, may overvolt | Downstream must withstand it itself, pushing the problem downstream |
| Shut down to protect | Off | Power loss | Safety-related loads cannot lose power |
| Current limit + thermal foldback | Current drops to very little | Voltage collapses but power is not cut | Output capability lost; downstream must tolerate it |
In automotive projects, the most common is a combination of the third and the fourth: when overvoltage exceeds a threshold, current limiting kicks in first, letting the output collapse without cutting power completely; if the temperature keeps rising, thermal foldback follows, pushing the current close to zero. This protects the chip while leaving the downstream a "low voltage but still powered" state, giving the MCU time to save data and enter safe mode.
The SOA requirement of this strategy then becomes: near the current-limit point, within 400ms, no secondary breakdown. This is far more lenient than "regulating at full load for 400ms", and it is the key design space that lets 60V devices land in real products.
One Action for Part Selection
Get a 60V-rated LDO and first turn to the SOA chart. Check three things: how many milliseconds it is drawn to, what the current limit is in the 50~60V range, and whether the test condition is stated (TC = 25°C or 85°C).
If it is drawn only to 10ms, or there is no SOA chart at all, then this device is unverifiable for load dump. It is not that it cannot pass; it is that you cannot prove it passes.
Cost Four: Heat Is Amplified Fivefold
The first three costs can still be improved by design; this one is a law of physics and cannot be avoided.
An LDO's Heat Is Dropout Times Current
An LDO is a linear regulator; its power dissipation equals input minus output, times the load current:
PD = (VIN − VOUT) × IOUT
The formula looks plain, but it means: every time the bus voltage doubles, the heat at the same current doubles too.
12V down to 3.3V is a dropout of 8.7V. 48V down to 3.3V is a dropout of 44.7V. The dropout is 5.14 times. For the same 100mA load, the former dissipates 0.87W and the latter 4.47W.
What 4.47W Means
Plug in the thermal resistances of four common packages, with the ambient temperature at the common automotive 85°C:
| Package | RθJA | Temperature rise | Junction temperature | Verdict |
|---|---|---|---|---|
| SOT-23 | 220°C/W | >900°C | >1000°C | Physically impossible |
| SOT-89 | 100°C/W | >400°C | >500°C | Physically impossible |
| TO-252 | 70°C/W | >300°C | >400°C | Physically impossible |
| DFN 5×6 | 45°C/W | >200°C | >280°C | Physically impossible |
All four packages are out. Note that this is not "a bit over" but over by an order of magnitude: the chip would hit thermal shutdown long before reaching that temperature.
Only bringing the current down gives a solution. Again 48V→3.3V:
| Package | Power | Temperature rise | Junction temperature | Verdict |
|---|---|---|---|---|
| SOT-23 | 0.89W | 197°C | 282°C | Impossible |
| SOT-89 | 0.89W | 89°C | 174°C | Above 150°C |
| TO-252 | 0.89W | 63°C | 148°C | Against the 150°C line; not usable in production |
| DFN 5×6 | 0.89W | 40°C | 125°C | Usable |
The conclusion is clear: going straight from a 48V bus to 3.3V, the current can only reach the 20mA range, and a package with an exposed thermal pad such as DFN 5×6 is mandatory.
That is why high-voltage LDOs on the market generally offer 100~150mA output current, and their packages are all moving to DFN. Judging from the distribution of publicly available models, WLCSP and DFN small packages together account for about 40% of high-voltage LDOs, and the share is higher at the high-voltage end. This is an engineering judgment, not a statistic, and the basis for it is heat: one package size smaller, and the thermal math does not work.
Comparison: The Same Current in a 12V System
The same 100mA from 12V down to 3.3V dissipates 0.87W. On SOT-23 that is still 276°C, so even in a 12V system, 100mA should not use SOT-23. SOT-89 is 172°C, still over. TO-252 is 146°C, marginal. DFN 5×6 is 124°C, solid.
This shows one thing: thermal design is not a problem "only high voltage has"; high voltage pushes it from the edge over the cliff. In a 12V system, engineers can still barely get by with derating and copper area; in a 48V system there is no such room.
Three Values You Can Change
For the heat calculation, there are three adjustable items in engineering:
- Lower the current: the most direct. Where 48V is dropped straight down, splitting the load into several rails of 10~20mA each is easier to solve than one 100mA rail
- Change the package: moving from SOT-89 to DFN 5×6 drops the thermal resistance from 100 to 45, halving the temperature rise for the same power. The price is that the PCB must reserve a thermal pad and a via array
- Change the architecture: do not drop straight from 48V to 3.3V. Use a Buck to step down to 12V or 5V first, then use an LDO as the post-regulator. The LDO's dropout then falls from 44.7V to 8.7V or 1.7V, and the heat drops by an order of magnitude
The third option matters most, because it determines the real position of a high-voltage LDO in the system: it is not there to replace the Buck, but to provide a clean, low-noise, fast-responding last hop after the Buck. The 44.7V dropout from a 48V bus to 3.3V was never meant to be carried by the LDO alone.
This Also Explains the Current Ceiling of High-Voltage LDOs
It is not that the process cannot make a 1A high-voltage LDO; it is that the thermal math does not work. A 1A 60V LDO dissipates 43W at 48V→5V, and no package can save it.
So the product definition of a high-voltage LDO is inherently "low current, large dropout, high voltage rating". Anyone who wants to make it a high-current device has to solve heat dissipation first, not the circuit.
Cost Five: Qualification Time
The first four costs are technical; this one is about time. It does not affect whether a device can be made, but it decides whether it gets into projects.
What Grade 0 Means
AEC-Q100 divides automotive devices into several grades by ambient temperature. Grade 1 is −40~125°C; Grade 0 is −40~150°C. That looks like only 25°C apart, but the difficulty is a full step higher.
The reasons are physical:
- Leakage: PN junction reverse leakage rises exponentially with temperature; from 125°C to 150°C, leakage rises by another 5~8 times or so. This hits the IQ specification directly
- Metal electromigration: at the same current density, 25°C hotter roughly halves electromigration lifetime per the Arrhenius relation
- Package materials: the long-term stability of mold compound, silver sinter layers and solder at 150°C is not the same as at 125°C
- Parameter drift: temperature drift of the reference voltage, offset and gain must be re-verified at the 150°C end
So Grade 0 is not a matter of "testing a few more temperature points"; it means redoing everything from design and process to package.
Time and Cost
According to public information, a device typically takes 12~18 months from project kickoff to Grade 0 qualification. Costs are on the order of several hundred thousand to over a million RMB, depending on the test items and whether functional safety is included.
Even more troublesome is the cost of change: AEC-Q100 qualification is tied to a specific process, a specific package and specific test conditions. Changing one mask layer in the process, switching one package material, or even moving to another production line at the fab can all trigger requalification. This means that once the 60V platform's process is frozen, it is hard to touch afterward.
The Current Domestic Landscape
How high the bar is shows most clearly in the timeline: an automotive LDO, from process freeze to Grade 0 report, usually takes 12~18 months, with at least three tape-out lots for verification in between. Testing covers high-temperature operating life, temperature cycling, HAST and EMC retest, and if any item fails, the lot has to be rerun. A project frozen only at the end of 2026 will have its production ramp scheduled for 2028. This is not "the industry not trying"; the return on investment of Grade 0 means most companies do Grade 1 first, consumer and industrial grades first, and save Grade 0 for when a concrete project pulls for it.
On the other hand, localization of the 60V-and-above classes is already under way. Publicly visible progress is concentrated in the 70V automotive class and the secondary power domains downstream of DCDC on 800V platforms. This shows that the road has already been walked; what remains is not a question of feasibility but of investment pace.
This landscape shows that the 60V class is not uncharted territory, but it is not a red ocean either. Few companies can do it, and even fewer can deliver low IQ, high voltage rating and deep trench isolation all at once.
How the Qualification Math Feeds Into Product Decisions
A 12~18-month cycle means that if the target is to be in vehicles in 2028, the process must be frozen between the end of 2026 and early 2027. And freezing the process in turn locks in the answers to the previous four costs. This is not a decision you can make as you go.
| Cost | Nature | Adjustability | Decision point |
|---|---|---|---|
| Process | Junction isolation → deep trench, area 1.6~2.0× | Irreversible, locked after freeze | Before project kickoff |
| IQ | High-voltage transistor leakage rises with area and temperature | Can be optimized, but has a physical floor | In step with the process |
| SOA | 400ms is close to DC; secondary breakdown boundary narrows | Avoided through protection strategy | Circuit design stage |
| Heat | Dropout 5.14×, power amplified by the same factor | Solved by derating, package, architecture | System design stage |
| Qualification | 12~18 months; changes mean starting over | Cannot be compressed | Starting point of the project schedule |
In this table, "heat" and "SOA" can both find a way out at the system level: the former through derating, package and architecture, the latter through protection strategy. The remaining three (process, IQ, qualification) must be borne by the chip itself. This is also why moving to 60V is a platform-level decision: it has to answer four questions at once, about process, IQ, protection strategy and qualification schedule, and if any one is answered wrong, the other three have to be redone.
Where 60V Really Belongs: Four Scenarios
With the five costs worked out, the question naturally becomes: with so many costs, what is it all for? The answer is on the demand side. In 2026, four scenarios are turning 60V from "optional" into "mandatory".
Scenario 1: Automotive 48V Architecture, from Concept to Production Pressure
48V is nothing new in cars; mild hybrid systems have used it for more than a decade. But the change in 2026 is not on the powertrain side; it is on the power distribution side.
Three things happening at once are driving this round of adoption:
- Zonal architecture replacing distributed ECUs: the roughly 150 scattered ECUs in a conventional vehicle are being consolidated into 3~5 zone control units (ZCUs) for the front compartment, left and right sides and rear compartment. Power distribution authority moves from the central fuse box down to the ZCUs, and the load power each ZCU manages jumps from tens of watts to hundreds of watts or even 2kW
- Chassis-by-wire on the eve of mass production: 48V brake-by-wire eliminates the hydraulic mechanism, and steer-by-wire makes the steering ratio software-adjustable within a range of 6:1 to 14:1 (calibration differs by model; this is an industry generalization)
- Fully active suspension at scale: 48V integrated fully active suspension packages the motor, hydraulic pump and controller at the wheel end, with control response within 6ms and peak regenerative power of up to 8kW
The industry pace is already dense: in April 2026 Chery and Bosch signed a framework agreement for joint development and mass production of a 48V vehicle architecture, raising supply power to 15kW and cutting system weight by more than 10kg; NIO has put 48V fully active suspension into the ES9; Leapmotor has announced 48V power for the whole vehicle with LEAP 5.0; Ford plans to debut a 48V low-voltage architecture in 2027 on a midsize electric pickup built on its in-house UEV (Universal EV) platform. "Universal" here means "general-purpose" and has nothing to do with General Motors; the vehicle's traction battery is still 400V LFP, and 48V covers only the low-voltage side, so the two divide the work differently. Xiaomi, Hyundai and others are also following with 48V-related systems.
Why does it have to be 48V? Because of current. For the same 1kW load, 12V needs about 83A, while 48V needs only about 21A. Joule loss is proportional to the square of current, so in theory it can fall to one sixteenth. Harnesses get thinner, connectors smaller, and the weight and cost of the whole supply chain come down with them.
But a 48V bus is 58.8V at full charge, and that voltage falls in the absolute no-go zone for 40V devices. As long as power has to be taken from the bus side, 40V is not up for discussion. And the ZCU supply, CAN transceivers, sensor bias and the auxiliary supply of gate drivers all need power from the bus. That is where the 60V LDO sits.
How Much Current Does an LDO Carry in a 48V System?
Not much, and it doesn't need much. Typical loads in a zone controller: CAN/FlexRay transceivers 20~50mA, sensor bias 5~20mA, auxiliary supply for isolated gate drivers 10~30mA, monitoring and wake-up domain 1~5mA.
What these loads have in common is low current, low noise and no power interruption. They fall right in the capability range of high-voltage LDOs, and they also sidestep the thermal math of the previous section: 20mA straight down from 48V on DFN 5×6 is 125°C, usable.
Scenario 2: Humanoid Robots, the 48V Bus Becomes the Industry Default
Humanoid robots choose 48V for reasons not quite the same as cars: it is the upper limit of safety extra-low voltage.
But the words "safety voltage" actually cover three different numbers, and mixing them up leads to conclusions that contradict each other.
ES1 (IEC 62368-1): 60V DC. This is the criterion in the product safety standard. Note that it is not called SELV: 62368-1 no longer uses the term SELV and has switched to ES1/ES2/ES3, classified by energy source. ES1 means "perceptible on contact, but not painful and essentially not injurious".
SELV (IEC 60364-4-41 / IEC 61140): 50V AC or 120V DC (ripple-free). This is a concept from installation rules, looser than ES1's 60V DC, because it governs the insulation and separation of fixed electrical installations, not just voltage.
PELV (IEC 60204-1): 25V AC or 60V DC; the electrical standard for machinery is one class more conservative, with stricter 15V-class limits set separately for damp, immersed and repeated-contact environments.
A 48V platform falls within ES1's 60V, and also within SELV's 120V DC, but it is already against the ES1 upper limit: 58.8V at full charge leaves only 1.2V of margin. This is the root reason 48V became the robotics industry's default bus: it is the intersection of "able to get enough power" and "no need for high-voltage insulation protection". Go one class higher, and the costs of insulation, creepage distance and safety certification all jump a level at once.
A typical bipedal humanoid robot has 28~45 joint actuators; the high-torque lower-limb joints can reach 1~5kW peak power, and whole-machine bus peak current can reach 300~500A. At the same time, a pile of low-voltage loads need power:
- GPU/CPU compute platform: 12V, 19V or 24V, peak current about 20A
- Dexterous hands: 12V or 24V, about 150W peak power per hand
- Vision, LiDAR, torque sensors and communication modules: close to 200W in total
- Fans, I/O and other peripherals: many scattered low-current rails
There are two mainstream supply topologies for these loads. One is central step-down: a 48V→12V main converter in the PDU, 12V distributed to each joint board, and the joint boards do only the low-voltage 12V→5V/3.3V conversion. The other is 48V direct-drive joints: the 48V bus runs directly to each joint board, which does 48V→12V/5V/3.3V locally.
Route B's advantages are thin harnesses, ample instantaneous power, and local shorts that do not take down the whole body. The price is that every device on the joint board has to be selected for 100V, one class above the 75V abs max of this article's main line. Here is where that class comes from: with direct drive, the 48V bus is live all the way, and the joint board also has a local inverter bridge. Switching ringing, motor back-EMF feeding back and braking energy regeneration all push the bus upward, and with these spikes stacked on 58.8V full charge, a 75V margin is no longer enough. This route is outside the scope of this article; its position is only marked here. Whichever route is taken, low-noise, low-current loads such as sensors, encoders and communication interfaces all need power from the 48V or 12V rail, and the place of high-voltage LDOs there is clear.
Robots have one more peculiarity: standby power directly affects battery life. When the whole machine sleeps, the safety monitoring domain and the communication wake-up domain must stay powered. This is where the IQ math of the earlier section comes in: every 1μA on a 48V bus is equivalent to 14.5μA in a 3.3V system.
Scenario 3: AI Racks, the 48V Intermediate Bus
The power architecture of AI servers is migrating to 800VDC, and rack power is going from tens of kilowatts to hundreds of kilowatts. The change is in the division of labor: HVDC comes into the rack, and 48V steps back to a board-level intermediate rail, then on down to the point of load. 48V is no longer the rack backbone but the "board-level transition" between 800V and 1V, yet it is still the most commonly used voltage at this stage.
In this architecture, 48V plays the role of intermediate bus: 800V is stepped down to 48V by fixed-ratio bus converters, 48V is distributed to each compute tray, and inside the tray it goes 48V→12V/6V or directly through a ratio-based converter to below 1V.
In this chain, the LDO sits in the auxiliary circuits: the BMC management controller, fan control, PHY supply, clocks and sensors. These loads draw very little current (a few mA to tens of mA), but have high demands on noise and reliability, and must take power directly from 48V; inserting another Buck stage in between is not worth the cost or area.
Data centers have one extra requirement: reliability carries enormous weight. One failed auxiliary LDO that takes a whole tray down costs far more than the device itself. This is also why this scenario is willing to pay for "voltage margin".
Scenario 4: 24V Industrial and Telecom
This scenario is not as hot as the first three, but the volume is very stable. The 24V industrial bus is standard in PLCs, inverters, servo drives and industrial robots, and the −48V DC supply in telecom equipment works the same way.
A 24V system's voltage range is usually 18~30V; add the surges of the industrial environment and the turn-off spikes of inductive loads, and peaks can reach 40~60V. A 40V device is right at the edge here too. And industrial customers have extremely low tolerance for "downtime": one device failing under a surge costs the downtime of a whole production line.
What sets this scenario apart: it needs no automotive qualification, but its reliability demands are no lower than automotive. It gives the 60V class a window to land that does not depend on AEC-Q100: an industrial-grade version can ship volume before the automotive one, verifying the process and reliability.
| Scenario | Bus voltage | Typical current | Key specifications | Qualification bar |
|---|---|---|---|---|
| Automotive 48V | 36~58V | 10~50mA | Load dump withstand, Grade 0, low IQ | AEC-Q100 + ISO 26262 |
| Humanoid robots | 42~58V | 5~30mA | Low IQ, small package, transient immunity | Mainly industrial grade |
| AI racks | 48V intermediate bus | A few mA to tens of mA | Reliability, noise, long-term stability | Industrial grade + customer-defined |
| 24V industrial | 18~30V (60V peak) | 10~100mA | Surge withstand, wide temperature, long life | Industrial grade |
Taken together, the four scenarios show that demand for the 60V class is real, dispersed, and ramping up at the same time. This is also the basis for STST's decision to extend its product roadmap upward from 40V: it is not following a trend; four downstream markets are pushing bus voltages up at the same time.
The Boundary: When 40V Is Still the Best Answer
After nine sections on "why move to 60V", this section covers the other side: for most scenarios, 40V is still the right choice.
If an article about voltage rating upgrades only tells you to "go higher", it is selling parts, not discussing engineering. The real answer depends on the scenario.
Four Typical Systems: Which Side Do They Fall On?
Three Criteria, a Thirty-Second Decision
Calculate the system's highest continuous operating voltage and multiply by 1.15 to get the minimum voltage rating requirement. A 48V Li-ion pack is 58.8V at full charge, ×1.15 = 67.6V. This number alone rules out every device rated 60V with a 65V abs max.
TVS nominal clamping × 1.10 (spread) × 1.10 (temperature drift) + 8V (ground bounce): the resulting actual peak must be below 80% of the device's abs max. Without 20% margin, production lots will certainly run into problems.
Use PD = (VIN − VOUT) × IOUT to calculate power dissipation, multiply by the package thermal resistance and add the ambient temperature, and see whether it is below 150°C (automotive) or 125°C (industrial). If it doesn't pass, think about architecture first, then package.
If any one of the three criteria lands on the "must be 60V" side, there is no room to maneuver. If all three are on the "40V is enough" side, paying more for 60V is waste: the extra cost will end up in the end-product price.
An Often Overlooked Middle Ground
Many systems are neither pure 12V nor pure 48V but a 12V/48V hybrid architecture: a 12V network is kept for traditional loads, while 48V supply is added for high-power loads. This architecture will be around for a long time.
For LDO selection, this means the same board may need both 40V and 60V devices: 40V in the 12V domain, 60V in the 48V domain. This is not "upgrade and replace"; it is "coexist".
So STST's product roadmap is not to stop 40V and switch to 60V, but to keep serving 12V and post-regulation applications with the 40V platform while extending the voltage rating to 60V and above, forming a ladder covering 40V, 60V and higher classes. For customers, this means the same design rules, the same package preferences and the same application support can be used all the way from the 12V domain to the 48V domain.
Going to Higher Voltage Ratings Is a Technical Direction, Not a Part Number
To put it more plainly: STST intends to develop products toward higher voltage ratings. This direction is not as simple as "making a 60V LDO"; it has three layers:
- Voltage rating layer: going up from 40V to cover classes with a 60V rating and an absolute maximum rating of 75V or more, leaving margin for 48V buses and load dump without centralized clamping
- Process layer: selecting and building up high-voltage isolation processes, including introducing deep trench isolation, and the coexistence of high-voltage devices and low-voltage logic on the same die
- Specification layer: holding IQ, transient response and thermal performance while raising the voltage rating; these three are where the high-voltage class most easily loses ground all at once
Of the three layers, the second is the hardest and the least reversible. It determines whether the next three to five years can keep moving toward 80V and 100V.
An Honest Reminder
Moving the voltage rating up does not mean every specification moves up. The 60V class will have worse IQ than the 40V class, higher cost and larger packages. If a customer compares a 60V product against a 40V spec sheet, it will certainly look like "a step backward".
What needs to be made clear at that point is: what it buys back is the ability to survive on a 48V bus. This is not adding and subtracting on the same ruler; it is a different operating environment.
Closing
Two Cases, One Dividing Line
Back to the two devices at the start. Both were rated 60V, both passed prototype testing, and both went into the same kind of product. They differed in only two places: one had an absolute maximum rating of 65V, the other 75V; one used junction isolation, the other deep trench.
Those two differences decided their 3rd pulse on the OEM's test bench.
So what "moving to 60V" really means is not changing the rated number from 40 to 60. It is five things happening at once: the voltage rating definition expands from "rated" to "absolute maximum + load dump withstand + SOA"; the process changes from junction isolation to deep trench; the IQ target relaxes from single-digit μA to the teens of μA, but with the high-temperature curve in view; thermal design changes from "it can take it" to "it has to be calculated"; and the qualification cycle changes from "a few months" to "a year and a half".
Only doing these five things together counts as an upgrade. Changing only the rated number is just changing the label.
And what drives all this is the 48V bus spreading from cars to robots, to AI racks, to the factory floor. As the bus goes up, the boundary of 40V is squeezed into that one corner of 12V systems. This is not manufacturers wanting to sell more expensive devices; the systems really have raised the voltage.
For STST, this roadmap is clear: extend the voltage rating upward, build a solid process foundation, and hold IQ and heat. Not fast, but every step has to stand up on the test bench.
References and Data Notes
The technical arguments in this article are based on public standards and manufacturers' public information. Load dump test conditions follow ISO 16750-2 (2023 edition); Pulse 5a/5b has been moved out of ISO 7637-2, and the article distinguishes between the two. Device-level parameters (IQ, thermal resistance, SOA) are publicly available industry ranges; for specific models, refer to their latest datasheets. Thermal calculations use the conservative assumption of TA = 85°C, natural convection and no additional heat sink.
- Gao Yang, How to Choose the Right TVS for Load Dump (in Chinese), EE Times China, 2026-11. Includes a comparison of ISO 7637-2 and ISO 16750-2 test conditions, the load dump energy formula and worked examples.
- Shanghai Leiditech, Car Load Dump Standards and Protection Measures, 2026-03. Includes a parameter comparison of ISO 7637-2 and ISO 16750-2, and the selection principle "without a company standard, pair high voltage with high resistance and low voltage with low resistance"; the pairing values in OEM specifications (Chrysler PF-9326, Ford ES-XW7TCI240, etc.) must be checked in the original specification documents.
- Jiemian News, 48V Enters the Production-Pressure Phase (in Chinese), 2026-11-15. Covers how zonal control architecture, chassis-by-wire and fully active suspension are driving 48V.
- Sina Tech, The Turning Point of Automotive E/E Architecture: 48V Has Become Reality (in Chinese), 2026-11-06. Includes ZCU power ranges and a 12V/48V current comparison.
- Zhidx, The Higher the ADAS Compute, the Harder the Vehicle Power Supply: Full-Chain 48V Power Layout (in Chinese), 2026-11-06. Includes progress on the ISO 21780 and ISO 25769 standards.
- OFweek, Humanoid Robot Competition Enters Its Second Half: Why Power Architecture Becomes Key (in Chinese), 2026-11-26. Includes the 48V main bus, joint peak currents and the power distribution of each load.
- Elecfans, How Embodied AI Robot DC Power Systems Handle Frequent Transient Load Steps (in Chinese), 2026-10-23. Includes the 48V power architecture and the basis for part selection.
- EEFocus, Where Does 48V Actually Land: Two Routes for the Humanoid Robot Power Tree and a Complete Part Number Map (in Chinese), 2026-10-08. Covers the trade-offs between the central step-down and 48V direct-drive routes.
- Sina Tech, Powering AI: 48V Ratio-Based Power Architecture Greatly Reduces Thermal Loss (in Chinese), 2026-11-25. Includes the intermediate bus evolution from 800V→48V→12V/6V and a comparison of point-of-load architectures.
- Delta Electronics, What is the difference between SELV, PELV and ES1 in AC/DC Power Supplies?, 2026-02. Definitions and applicable standards of the three sets of limits: ES1 / SELV / PELV.
- S. H. Voldman, A. Watson, The influence of deep trench and substrate resistance on the latchup robustness in a BiCMOS silicon germanium technology, 2004 IEEE International Reliability Physics Symposium (IRPS) Proceedings, Phoenix, 2004-04, pp. 135–142, DOI 10.1109/RELPHY.2004.1315314. Measured effects of deep trench and substrate resistance on the turn-on / trigger / holding conditions of PNPN structures, and the latch-up design space formed by "trench depth × substrate resistance".
- S. H. Voldman, A review of CMOS latchup and electrostatic discharge (ESD) in bipolar complimentary MOSFET (BiCMOS) Silicon Germanium technologies: Part II—Latchup, Microelectronics Reliability, Vol. 45, No. 3–4, 2005-03, pp. 437–455, DOI 10.1016/j.microrel.2004.12.001. A systematic review: the four design parameters that affect latch-up (npn / pnp current gain, n-well contact to p+ spacing, substrate contact to n-well spacing), the role of deep trench as the third axis of the design space, and the design box boundary of an external substrate resistance of about 100Ω.
- STST Technology, LDO product series parameter summary (bilingual Chinese/English), the source of the 40V-class comparison data in this article.
FAQ
Is the 5V between a 60V rating and a 65V absolute maximum really that critical?
In a 12V system, 5V may not be critical, because the TVS holds the voltage around 40V. In a 48V system, those 5V are the line between life and death: 58.8V at full charge is already against 60V, and the 71V load dump peak goes straight past 65V. The device in Case A died on the 3rd pulse, and the root cause was those 5V. The test is simple: multiply the system's highest continuous voltage by 1.15, and the result must be below the abs max. Below it, enough; not below it, not enough. The rated value has no place in this calculation.
My board already has a TVS. Do I still need a 60V LDO?
It depends on whether the TVS clamping point can really hold. A TVS nominally rated 38V, with spread, temperature drift and ground bounce added, actually peaks at 54V. At that point the 40V device is already dead, TVS or no TVS. Conversely, if the system has vehicle-level centralized clamping (ISO 16750-2 Test B, about 35V), a 40V device really is enough, and there is no need to pay for 60V. So the question is not "is there a TVS" but "what is the TVS's actual peak".
Should a 48V system use 60V or 80V?
Look at two things: the bus full-charge voltage, and whether there is centralized clamping. A 14-series Li-ion pack is 58.8V at full charge; at 1.15× that requires 67.6V. A 60V rating covers the operating voltage; what falls short is the abs max: the 65V class is a step short, and you should choose an abs max ≥ 70V. If the system has centralized clamping that holds load dump to 35V, a 60V rating with a 65V abs max also works. The more robust engineering approach: set the rating at 60V (covering the operating range) and the abs max at 75V or above (covering load dump), so there is margin at both ends.
Can a high-voltage LDO replace a Buck?
No, and it shouldn't. An LDO's heat equals dropout times current: for the 44.7V dropout from 48V to 3.3V, 100mA is 4.47W, and no package can save it. The right place for a high-voltage LDO is the last hop after a Buck: providing a clean supply with low noise, fast response and no switching ripple. Or on auxiliary circuits whose current is small to begin with (a few mA to tens of mA), where the dropout is large but the absolute power is small, and an LDO is actually simpler, cheaper and more reliable than a Buck.
Can junction-isolated devices never be used at 60V?
Not necessarily. Whether junction isolation works at 60V depends on whether the loop gain of the parasitic PNPN exceeds 1, which in turn depends on the specific layout, doping and isolation spacing design. Some designs can hold the loop gain down by increasing the isolation spacing and adding guard rings. But the risk of this route is that it depends on design details, and no datasheet will say "our junction isolation will not latch up under a 71V transient". So for projects that are safety-related or must pass the ten-pulse test, deep trench is the more verifiable choice.
Why is the IQ of a high-voltage LDO so much higher than a low-voltage one?
Mainly leakage in the high-voltage transistors. The overvoltage detection and start-up circuits must connect directly to VIN, so they need high-voltage transistors; high-voltage transistors have a large junction area, and PN junction reverse leakage is proportional to area and exponential in temperature. From 40V to 60V, junction area grows more than 2 times, and leakage rises with it. And at 125°C this gap is amplified dozens of times. So when comparing the IQ of high-voltage LDOs, always look at the high-temperature curve; looking only at the 25°C typical value is meaningless.
What is STST's plan for its high-voltage LDO line?
The direction is clear: while the existing 40V platform continues to serve 12V and post-regulation applications, extend the voltage rating to 60V and above. This roadmap involves three layers of work: covering the voltage rating classes, introducing and building up high-voltage isolation processes, and holding IQ and thermal performance as the voltage rating rises. In terms of pace, an industrial-grade version will come first, using industrial 24V and robotics applications to verify the process and reliability, followed by automotive qualification. For specific part numbers and timelines, please contact our application team.